Temporary bridges are being built on I-44 at Memorial Drive, shown here, and 31st Street, which signals the start of the next bridge project along I-44. The bridges are being built on the westbound side, which indicates that the eastbound bridges will be the first replaced. Girders have been erected on the west half of the Memorial Drive bridge and all of the 31st Street bridge. Photograph taken May 18, 1995.