The westbound Broken Arrow Expressway bridge over Irvington Avenue is experiencing severe deck problems and will have to be redecked. No timetable has been announced for the project, but the bridge deck is very rough from the numerous repairs that have been made. The railings also have been damaged, as evidenced by the broken sections on the south railing. This photograph was taken August 21, 1987.
Click tabs to swap between content that is broken into logical sections.