Paving is winding down on the southbound lanes of Sheridan Road between 52nd and 54th streets. The paving is complete except for a small portion near 52nd Street. Upon completion of the base paving, a final layer of asphalt will be applied to the entire section before it is striped. This photograph was taken April 23, 1988.
Click tabs to swap between content that is broken into logical sections.