Paving is continuing on Sheridan Road between 57th and 59th streets. The northbound lanes have the base layer of asphalt in place, and curbing is complete. This section needs another layer of asphalt to match the level of the southbound lanes. A final layer of asphalt will be applied to the entire mile-long section before it is striped. This photograph was taken April 23, 1988.