Asphalting on the northbound lanes of Sheridan Road between 52nd and 57th streets is progressing at a steady pace as shown in this view looking south from 52nd Street. The base level has been laid between 52nd and 55th streets, and two more layers must be installed before traffic can be switched to these lanes to permit reconstruction of the southbound lanes. This photograph was taken February 26, 1988.
Click tabs to swap between content that is broken into logical sections.