Storm sewer work is under way on the northbound lanes of Sheridan Road between Little Joe Creek and 53rd streets, and the storm sewer box on the bridge has its metal grate and opening on place. The top of the bridge has been covered with dirt in preparation for paving the new roadway. This area of Sheridan Road is very muddy due to the recent winter weather, including a 12-inch snowfall that occurred a week ago. This photograph was taken January 15, 1988.