The outer walls of the Little Joe Creek bridge on Sheridan Road are being poured, and the center portion soon will be poured. These walls eventually will connect with the completed section of the bridge, which will allow pouring of the concrete deck. This photograph was taken November 29, 1987.
Click tabs to swap between content that is broken into logical sections.