Construction is nearing completion on the west half of the Sheridan Road bridge over Little Joe Creek. The railing has been poured, and the remainder of the north retaining wall should be poured in the next few days. The east half of the bridge still needs to be replaced, and the old bridge's railing can be seen at left. This photograph was taken September 25, 1987.
Click tabs to swap between content that is broken into logical sections.