Dirt work continues on the future eastbound lanes of 61st Street east of Sheridan Road. The dirt is being leveled in preparation for future paving. The outer boundary of the new roadway can be identified by the small "ridge" to the right of the roadbed. This photograph was taken November 18, 1983.
Click tabs to swap between content that is broken into logical sections.