Paving is under way on the nortbound lanes of Yale Avenue south of Apache Street. Unlike the Apache Street approaches, which received a concrete overlay on existing sections, this approach is being built from the ground up because the old roadway was two lanes. The two through lanes and right-turn lane have been paved, and a couple of gaps need to be paved before traffic is switched to these lanes. Photograph taken October 31, 1987.