Decking is under way on the Broken Arrow Expressway bridges over Harvard Avenue. This view, which shows the eastbound bridge, shows that concrete (covered in plastic)has been poured on about half of the bridge, with the remainder set to be poured in the next week or so. The MKT Railroad is in the foreground. This photograph was taken September 11, 1987.