Paving is well under way on the Gilcrease Expressway as seen in this view looking west from the New Haven Avenue bridge. The connections to the Harvard Avenue ramps remain to be paved, as does the eastbound right lane/shoulder. The Harvard Avenue bridges are in the background, with the top of the ramp at U.S. 75 barely visible just to the right of the bridges. Photograph taken April 16, 1988.
Click tabs to swap between content that is broken into logical sections.