Construction is progressing on the 81st Street bridge over Fred Creek. The west abutment wall and first pier have been poured, and work is under way on building the second pier. A third pier will be poured, and this will be followed by the east abutment wall. The bridge site is dry because Fred Creek is being routed through a pipe system to avoid the bridge area. Photograph taken August 12, 1987.