The I-244/U.S. 75 Arkansas River bridge project is complete, and all lanes and ramps have reopened. The new bridge decks are high-density concrete that was installed on top of the old decks. The project also included repainting the steel girders (portion over the river) on both bridges. Photograph taken December 1987.