Traffic has been switched over on both of the I-244/U.S. 75 Arkansas River bridges, and repairs are being made to the bridge decks prior to installing the concrete overlay. This phase of the southbound bridge also will include redecking the 17th Street exit ramp, while the northbound bridge will include a portion of the exit ramp to the Broken Arrow Expressway. Photograph taken September 1987.