Widening of Memorial Drive between 91st and 111th streets is scheduled to begin this summer and be completed in about two years. The concrete that ends on the right is the future southbound lane of the new roadway, while the present roadway is located in the area where the northbound lanes will be built. Photograph taken April 15, 1984.
Click tabs to swap between content that is broken into logical sections.