The I-44 bridge over the former Midland Valley Railroad has been redecked with a high-density concrete overlay that converted the bridge into one wide span and removed the concrete barrier from the center. New bridge railings also have been installed. Work is continuing on the approaches, and the bridge should open this fall. This photograph was taken September 10, 1983.
Click tabs to swap between content that is broken into logical sections.