Construction is nearing completion at 21st Street and BoulderAvenue. This view, looking west, shows that the east approach is complete and open except for through traffic west of Boulder Drive. A small portion on the one-lane section of 21st Street needs to be paved before that roadway opens to traffic. Traffic signal poles are in place for the southbound and eastbound signals. This photograph was taken April 18, 1985.
Click tabs to swap between content that is broken into logical sections.