Railings are being installed on the 21st Street bridge. The north railing has been poured from Riverside Drive to the ramp, and the remaining section should be poured in the next few weeks. The railings on the south side remain to be poured. The section between these railings will be a bicycle lane. Photograph taken July 4, 1985.
Click tabs to swap between content that is broken into logical sections.