Traffic signals are operational at 21st Street and Boulder Drive, and 21st Street now is open between Boulder and Riverside drives (accessed by the right-through lane). The left lane will remain closed until the bridge opens later this summer. Photograph taken June 15, 1985.
Click tabs to swap between content that is broken into logical sections.