Paving is under way on the northbound lanes of Riverside Drive, as concrete now extends from 24th Street to the future connection to Boulder Drive/21st Street. Dirt work is continuing from this location to the north. The flat dirt area coming in from the left will be the future eastbound 21st Street to northbound Riverside Drive ramp. Photograph taken November 3, 1984.
Click tabs to swap between content that is broken into logical sections.