The days are numbered for the 21st Street bridge's old road deck, as a major redecking project is scheduled to begin within a couple of weeks. The car traveling the bridge on this date was one of the old deck's final vehicles. Preparatory work already is under way on the bridge, including the removal of lights from the bridge and most of the orange barrels from the outside lanes. Photograph taken August 19, 1983.
Click tabs to swap between content that is broken into logical sections.