The approaches have been poured for the 23rd Street railroad bridge, and work is under way on the sidewalks. Note the difference in height between the new and old concrete. The new approach is built at a different grade than the original road, and the concrete in the foreground will be replaced during the 21st Street bridge project. Upon completion of that project, the concrete grades will match. Photograph taken May 7, 1983.