Construction is progressing on the low water dam as shown in this view looking west from an overlook at the east end of the Pedestrian Bridge. The piers in the distance will support a walkway to the south, and the two floodgates can be seen to the left. The Pedestrian Bridge pier footings also are being repaired, and the new footings are smooth instead of rugged. In the distance, work is under way on the west end of the dam. The Arkansas River presently is channeled through the bridge's three middle spans. Photograph taken April 24, 1982.