Paving has been completed on 71st Street, and the roadway soon will open. The medians on 71st Street are wider than normal because the outer lanes are in place for a six-lane street. The medians will be reduced when the street eventually is widened to six lanes through the area. Photograph taken March 30, 1984.
Click tabs to swap between content that is broken into logical sections.