The new westbound lanes have been paved on 61st Street, and traffic soon will be switched to these lanes to allow repaving of the eastbound lanes. The traffic switch also will allow the south bridge embankment wall to be built. The north embankment wall already has been built. Photograph taken March 18, 1988.
Click tabs to swap between content that is broken into logical sections.