Dirt work is under way on the Mingo Valley Expressway between 55th Place and 61st Street as crews run bulldozers and other machinery along the roadbed to level the dirt hauled in by trucks. The reinforced-concrete bridge near 55th Place is buried, and dirt work is under way at 61st Street on the approaches for the new bridge. Similar work soon will begin on the south side of 55th Place for the bridge at this location. The protective fence has been installed along most of the right of way. The black cloud at right is the exhaust from road machinery. Photograph taken July 16, 1987.
Click tabs to swap between content that is broken into logical sections.