The asphalt base has been installed on 51st Street's westbound lanes from the Mingo Valley Expressway to west of Mingo Road, and paving forms (lower right) are being installed for concrete near the Mingo Valley Expressway. Traffic on 51st Street is to the left of the temporary concrete barrier wall. Paving should begin soon on these lanes and the northbound lanes of Mingo Road from south of 51st Street to the Broken Arrow Expressway. Photograph taken September 2, 1990.
Click tabs to swap between content that is broken into logical sections.