Work is continuing on the reinforced-concrete box bridge for 51st Street. The north half of the bridge is complete and has a temporary roadway over it, while the remaining section of the bridge has one pier (far right) remaining to be poured before the top section can be poured. With the exception of the bridge site, traffic on 51st Street remains on the temporary eastbound lanes. Photograph taken April 14, 1990.