Paving of the westbound lanes on 31st Street is complete except for two gaps near Briarwood Pharmacy, which should be paved soon. The section still needs curbing, and it then will open. The new street is wider than the original pavement at Memorial Drive because the 31st Street and Memorial Drive intersection is scheduled to be redesigned in the next few years. Following completion of that project, the roadway will be properly connected. This photograph was taken October 7, 1983.