Construction was completed at 31st Street and Memorial Drive in December 1985, although the traffic signal did not become traffic-activated until January 1986. This view, looking east, shows the new eastbound dual-left turn lane and right-turn lane. The original left-turn median was in the "outlined" area in the center of the This photograph was . At left, the extra portion of the westbound lanes can be identified by the brighter concrete. Traffic jams no longer exist in the left-turn lane. This photograph was taken August 3, 1986.