The 11th Street approachs at 129th East Avenue were widened to accommodate two through lanes (one each way) and left- and right-turn lanes. The approaches, which were built with asphalt and partial concrete curb and gutter, will be replaced with concrete when 11th Street eventually is widened in this area. No such work is funded at this time. This photograph was taken July 13, 1988.
Click tabs to swap between content that is broken into logical sections.